ALBERTA / PUBLIC-RECORD INTELLIGENCE Accepting new screens

ALBERTA WELL INTELLIGENCE / DESKTOP SCREEN

Know what to investigate before you commission the full work.

Directive 079 Development Screen turns public records and supplied site information into a preliminary, source-traceable desktop screen for Alberta development decisions.

Preliminary desktop intelligence. Not a survey, regulatory opinion, reclamation certificate, environmental assessment, or engineering sign-off.

SCREEN / 079REV. 01

Evidence register

Illustrative Alberta AOI

AW-019 Recorded well near supplied structure Requires physical location confirmation
AW-044 Revised location record Reconcile source coordinates
SYNTHETIC EXAMPLE

01 Alberta-specific

02 Source-traceable

03 Human-reviewed

04 Five-day target

WHY SCREEN FIRST

A recorded dot is not a field-confirmed well.

Public records are essential, but development decisions need context: what source produced the record, when it was retrieved, how close it falls to the AOI, and what remains unresolved.

01

Normalize the AOI

We review your site boundary, project context, and supplied plans before comparing them with current public records.

INPUT / KML, KMZ, GEOJSON, SHAPEFILE, PDF
02

Reconcile the records

Abandoned-well locations, revised coordinates, and relevant integrity context are kept distinct and source-dated.

METHOD / INTERSECT, DISTANCE, SOURCE REVIEW
03

Separate fact from inference

Every finding is marked preliminary, unresolved, or requiring specialist work, with a concrete next action.

OUTPUT / EVIDENCE REGISTER, MAP, NEXT ACTIONS

INTERACTIVE SAMPLE / SYNTHETIC DATA

Inspect the evidence, not just the pins.

This demonstration uses synthetic records to show how an AOI, screening bands, source notes, and unresolved questions appear in a customer screen.

EVIDENCE STATE

SYNTHETIC DEMONSTRATION
NOT FOR DECISION-MAKING

Preliminary Unresolved Requires specialist Basemap © OpenStreetMap contributors

THE ENGAGEMENT

A decision file your team can use.

Not a raw data dump. The screen gives your project team a bounded record of what was checked, what appeared near the site, and which questions require survey, field, engineering, environmental, legal, or regulatory follow-up.

01

Branded screening report

Concise PDF with project context, method, map plates, findings, limitations, and recommended next actions.

PDF
02

Interactive AOI map

Review identified records, source details, screening distances, and evidence states without specialist GIS software.

WEB MAP
03

Well and evidence register

Licence, recorded location, licensee, status, integrity context when available, source date, confidence, and unresolved questions.

CSV + TABLE
04

Portable spatial files

Downloadable CSV and GeoJSON for your consultant, planner, surveyor, or internal project system.

DATA

FROM SITE TO SCREEN

One clear handoff at every step.

  1. 01 / INTAKE

    Book the screen

    Pay the C$750 scoping deposit and identify the project, buyer type, and Alberta location.

  2. 02 / SCOPE

    Supply the AOI

    We review the boundary, project context, file quality, and whether the work fits standard scope.

  3. 03 / ANALYZE

    Confirm the balance

    After scope acceptance, the C$2,500 balance is issued privately and source review begins.

  4. 04 / DELIVER

    Receive the decision file

    Target delivery is five business days after AOI acceptance and balance payment.

STANDARD ENGAGEMENT

Start with a bounded screen, not an open-ended study.

The initial deposit pays for intake and scoping. It is applied in full to an accepted standard engagement.

STANDARD SCOPE One contiguous Alberta AOI Up to 25 km2 Up to 25 abandoned-well records
DIRECTIVE 079 DEVELOPMENT SCREEN CAD

C$3,250

standard engagement / applicable tax added at checkout

Due now
C$750 intake deposit
After scope acceptance
C$2,500 balance
Target delivery
5 business days
Deposit credit
Valid for 90 days
Before you book

This is preliminary desktop intelligence based on available public and supplied information. It is not a survey, legal opinion, regulatory approval, reclamation certificate, environmental assessment, engineering sign-off, or permitting decision.

Secure payment and receipt provided by Stripe

WORKING QUESTIONS

What the screen does and does not settle.

Does this prove a development complies with Directive 079?+

No. The screen identifies relevant public records, distances, source limitations, and required next actions. It does not replace confirmed physical well location, survey, testing, specialist review, municipal process, or an AER decision.

What if my AOI is larger than 25 km2?+

We review it during intake and provide a revised scope before requesting the balance. The C$750 deposit remains credited toward an accepted engagement for 90 days.

Can I start with an address or site plan?+

Yes. We accept an address, legal land description, project description, or PDF site plan when spatial files are not yet available. We confirm the interpreted AOI before completing the screen.

Are recorded abandoned-well locations survey-grade?+

No. Public coordinates are desktop-screening inputs. The report identifies when a record warrants physical locating, survey, testing, or other specialist confirmation.

What happens if Warre & Vavasour declines the work?+

If we decline before AOI or supplied-material review begins, the deposit is refunded. Once review begins, it is a non-refundable scoping fee credited to the engagement.

ALBERTA WELL INTELLIGENCE

Make the next investigation specific.

Start intake C$750 deposit
Start intake C$750